Associations

Modtech maintains relationships with a variety of industry associations and organizations.

Modular Building Institute U.S. General Services Administration (GSA)  American Institute of Architects: Continuing Education System (CES)

Modular Building Case Study: Arroyo Vista Elementary School

Project Overview

Designed to fit in seamlessly with the existing buildings, the Arroyo Vista Charter School kindergarten building is attractive as well as functional. The building is 72' x 40' and contains two kindergarten classrooms. The project includes features such as concrete floor poured over metal pan, 2:12 slope roof and traditional 3 coat stucco exterior matching the other buildings. The all electric split heat pump HVAC systems are high efficiency and the cooling coils are located in the ceiling cavity to conserve floor space. The required restrooms are shared between the classrooms to maximize space. Each classroom features a “wet” area outside of the teaching space which includes a kindergarten size sink and linoleum floor for easier cleaning.

Groundbreaking for the permanent concrete foundation occurred in October 2005 and the building was finished within 4 months. The project was completed within the expected time and the end result was another satisfied Modtech® customer.

Project Team Members

Modular Elementary School Building Photos & Floorplans

Click the photos to enlarge.

Permanent Classroom Additions
Permanent Classroom Additions
Close

Modular Kindergarten Classrooms
Modular Kindergarten Classrooms
Close

Permanent Classroom Additions
Permanent Classroom Additions
Close

Arroyo Vista Elementary School Floorplan
Arroyo Vista Elementary School Floorplan
Close



FIFA 14 Coins | WildStar Gold | WildStar Platinum | Fifa 14 Coins | Fifa Ultimate Team Coins | FIFA 14 Coins | Fut 14 Coins | Tattoo Supplies | Tattoo Kits | FIFA 14 Coins | Replica Handbags | Sexy Lingerie | FIFA 14 Coins | Wedding Dresses | Tattoo Supplies | Iphone 5s case | Wedding Dresses | Fashion Shoes | Wedding Dresses